HOME // DISTRIBUTION PRODUCTS // Defi // Meter Hood & Option // Triple Meter Hood |
 |
Triple Meter Hood |
The production of this product ended in March, 2012. |
 |
The TRIPLE METER HOOD allows Defi-Link Meters and Defi-Link Meter BFs to be mounted on Subaru New Age Impreza. |
|
 |
CONFIRMATION |
 |
Meter are not included(sold separately). |
 |
Product is not painted(undercoated). |
 |
Meters don't face the driver's side but to the center. |
|
 |
Triple Meter Hood - SAFETY WARNING - |
 |
WARNING |
indicates a risk of death or serious injury. |
CAUTION |
Indicates a risk of personal injury or damage to equipment. |
|
 |
WARNING |
 |
All the installation in this manual must be followed to ensure safety installation and operation of the product. |
|
 |
CAUTION |
 |
After the installation, please confirm that electric and electronics system work correctly. |
|
 |
Triple Meter Hood - PARTS LIST - |
 |
Triple Meter Hood - SPECIFICATIONS - |
 |
Applicable model/type |
Subaru New Age Impreza GD/GG E type '00.08~ |
Material |
Heat-Resistance ABS |
Size(inch) |
10.7(W) x 3.8(H) x 8.2(L) |
Size(mm) |
  |
Weight(lb) |
1.06 |
Surface finish |
undercoated (unpainted) |
Installable gauges |
2 3/8"(60mm)gauges
(Defi-Link Meters and Defi-Link Meter BFs are recommended)
*Other brands' gauges may not fit the holes of the hood.
*Regular Position Bezel cannot be installed in combination with the Triple Meter Hood for New Age Impreza. |
|
|
Triple Meter Hood - HOW TO INSTALL - |
 |
1. Install gauges |
 |
Fit gauges into the holes of the hood and push rubber-boots on gauges from the backside of the hood. |
 |
|
CAUTION |
 |
Clear away dirt from the gauge. |
 |
Push the rubber-boots tightly on the back of the face panel. |
|
 |
2. Dismantle the clock hood |
 |
Remove the clock hood from the instrument panel. Please mind that the clock hood has six hooks. Disconnect the clock wire connector. |
 |
|
CAUTION |
 |
The clock wire has to be fixed somewhere to avoid noise and short circuit. |
|
 |
3. Install the Triple Meter Hood |
 |
Install the Triple Meter Hood with gauges where the clock hood was originally placed. |
 |
|
CAUTION |
 |
Hooks may be broken if the excessive force is applied, so please be careful when installing. |
|
 |
4. Attach the Defi emblem |
Attach the Defi Emblem anywhere you like. |
|
PAINTING |
 |
1. |
The Triple Meter Hood Surface is undercoated. Please file the surface smooth gently with sandpaper(#800 or finer one) before painting. |
2. |
If you require better surface finish, please dismantle six screws from the backside of the Triple Meter Hood. Then paint the face panel and the hood separately. After the paint gets dry completely, please reassemble the screws and the hood. (Recommended tightening torque is between 50N and 80N.) |
|
CAUTION |
|
 |
Do not file the surface too much |
 |
Paint for plastic must be used. |
|
|
|
 |
|